How to install an electronic platform
The installation of the electronic platform should first have a more suitable and spacious site, and should ensure that the foundation has a large bearing capacity. Bearing capacity requirements for the foundation: According to different regions and different situations, the bearing capacity of each bearing must be greater than the * large overload capacity that may occur during the measurement process. Taking 60 tons of electronic platform as an example, the weight of the load-bearing platform is 10 tons, and the load of the rear axle of the truck is 50 tons when the load is full. The overload is assumed to be 1.25 times, and the impact coefficient of the upper load-bearing platform is 1.3, that is, each bearing The key *large load is: W = 1/2 (50t × 1.25 × 1.3 + 1/2 × 10) = 43.125t. In the foundation construction process, * several key building structures are in one overall. Under normal circumstances, two key buildings can also be built on a concrete foundation. The bearing capacity of each foundation cannot be produced under the force. Separate sinking changes. The bearing capacity of the longitudinal transverse anti-collision pier is small, and the lateral striking force is small. It can be manufactured with reference to the dimensions given in the foundation drawing, and the longitudinal impact force is large. Take the 60-ton electronic truck scale as an example: the car * large load M1 = 60t × 1.25 = 75t = 75000kg, the load-bearing platform M2 = 10000kg car speed is (* large) ν1 = 10km / h, in order to ensure the installation error of the instrument is small, the instrument The accuracy is high, and the following requirements are met: The level of the single load-bearing platform is within 1/500, and the height error of each bearing is not more than ±3mm. Wheat Grass Powder,Dehydrated Cabbage Powder,Dehydrated Spinach Powder,Dehydrated Cucumber Powder Laian Xinshuyu Food Co., Ltd , https://www.xinshuyufood.com